Receipt, transportation, storage and loading out of 117,000 tons of API 5l Pipe Joints.
Marine Agency, Customs Clearance, Freight Forwarding, Personnel Logistics, Receipt, transportation,
storage and loading of materials and equipment
The external coating of 20,000 six inch pipe joints that were delivered from Tenaris Argentina, required jet-wash cleaning prior to loading out from the Larnaca yard. This activity was carried out to remove the micron level, loose polypropylene external coating particles, prior to loading out onto PSV’s to ensure safe handling of the pipe when it is onboard the pipe laying vessel(s).
The pipe bundling activity involved the bundling and strapping of 7 (seven) 6” diameter API 5L for use as fibre optic cable (FOC) conduits to be installed inside the 32” CWC pipes for connection between the Production Platform and the onshore facilities.
Customs Clearance, Freight Forwarding, Personnel Logistics, Receipt, Transportation, and storage of materials and equipment for the Leviathan field Development Project